The Castle Outdoor Boulders
Probably one of my biggest challenges! Instead of pouring a concrete base, the boulders are supported on existing telegraph poles in the ground in order to improve the sustainability of the project. A feat of surveying and engineering! In order to achieve the same feeling of indoor climbing we decided to use plywood surface, and that meant researching and specifying materials and construction that would be long lasting in the British climate.
Location: London, UK
Opened: 2019
Type: Outdoor Boulders
Rubber: Recycled London Bus Tyres
Construction: Usteto
Engineering: Price & Myers
PREVIOUS BOULDERS VS NEW BOULDERS
1/2
TESTIMONIAL
"We have worked side by side with Michelle on some of our most challenging and design intensive projects. The process is always collaborative, smooth and delivered on time. We are not aware of anyone else in the industry who would meet our high specifications and design ideas."
Mike Langley (The Castle)